The construction of OHL 35 kV “Chornianka” – HVS SS 750 kV


Warning: count(): Parameter must be an array or an object that implements Countable in /home/ny409312/structum.ua/www/wp-content/themes/structum/single-project.php on line 31

The transmission power lines run through the Kherson region territory.

The length of the transmission power line is 20,826 km, of which the OHL is 17.576 km and the cable line is 3.55 km.

We installed 123 foundations, 123 towers, phase wire 53.4 km long, ground wire, power cabling 11.2 km long, and construction of air-cable crossing points.